Steel Bridge – 2002-03 Season

 

What a long, strange ride it was.

 

After an outstanding performance at the Regional competition at WPI on February 22nd, 2003, we placed third (behind UVM and UConn) due to an alleged dimensional penalty. However, after appealing the judges’ decision based on their use of inappropriate measuring tools in assigning the penalty, we were granted the chance to compete at the National competition.

 

At the National competition at San Diego State University on May 23-24, we were disqualified due to failure of the lateral load test (which, strangely enough, had passed at Regionals and we hadn’t thought to recheck). 

 

The University of Michigan won the National competition with a construction time of 1.7 minutes, a weight of 101.5 lbs, and an aggregate deflection of 0.598 inches.

 

Despite our seeming bad luck, a good time was had by all in San Diego.

 

 

Results from Nationals 2003

 

Const. Time (before penalties): 4.62m

Const. Time (after penalties): 5.408m

Weight: 220 lbs

Aggregate Deflection: 1.49 in

 

 

 

 

 

Photos of the 2003 regional and national competitions are posted in Photos.

 