2002-03 Fabrication Photos

 

Thanks to Darrell’s trusty Wagoneer, not even a blizzard could keep us from heading up to the fabricator.

 

 

 

Janice is very excited about the upcoming fabrication.

 

All is not lost – at least we made it to Dunkin’ Donuts.

 

 

Kristin cutting steel members on the bandsaw.

Finished beam sections laid out at the fabricator.

 

Finished truss sections.

 

The slide-together connection for the truss compression arch worked very well.

 

 

Close-up of the slide-together connection.

Rachael and Mariano operating the drill press.

 

Aaron measuring and marking parts.

 

 

 

Drilling holes in a bridge pier at Bray lab.

 

 

Emily, Kathryn, and Rachael: working hard or hardly working?

 

 

Drilling holes significantly reduced the weight of our bridge.